The fabrication, of the TAG, has had to be considered to be performed at ETL (due to the expertise there). Therefore, materials have gradually been sourced and ordered as the relevant information has been made available. Some pre-subcontracting has inevitably occurred, with some outsourcing (during the fabrication) necessary due to the lack of specific experience in those fields.